A full room addition and master bathroom build for a South Jersey homeowner who wanted their dream five-star suite.

Open Concept Conversion and Flooring Installation in South Jersey

Home Remodeling in South Jersey

This project is a whole-home renovation in South Jersey completed by DeCicco Property Group. For homeowners considering a room addition or master suite build, this project shows what is possible when you start from the studs and build exactly what you want.

Soaking tub installation in master bathroom addition in South Jersey
Full kitchen wall with white shaker cabinets and stainless steel appliances completed as part of a kitchen remodeling project in Hammonton, NJ.

Building a Five-Star Suite From the Ground Up

Ethel and her family wanted a master bedroom and bathroom that felt like a hotel suite. The existing home did not have the space or layout to make that happen, so a room addition was the solution.

DeCicco Property Group started by demolishing the existing structure down to the framing. Walls were opened up, old materials were removed, and the team assessed what could stay and what needed to go. New floor joists were installed to support the addition.

A new room was framed and built from the foundation up, attached to the existing home. The addition included the master bedroom and a full bathroom remodel with a soaking tub, new plumbing, insulation, and finish work throughout.

Ethel described the finished result as their five-star hotel suite. The team maintained communication throughout the project, finished each day’s work completely, and cleaned up at the end of every workday.

Features That Made This a Five-Star Suite

Full Room Addition With New Framing

The master suite was built as a ground-up addition. New wall framing, roof structure, and exterior sheathing were constructed and tied into the existing home. The addition expanded the footprint to accommodate both the bedroom and bathroom.

New Floor Joist System

New floor joists were installed to create a level, solid subfloor for the addition. Electrical wiring was run through the joist bays before the subfloor was laid. This provided a clean foundation for the finished flooring above.

Interior Demo and Structural Cleanup

The existing space was stripped to the studs. Old plaster, insulation, and damaged framing were removed. The team assessed the structural condition and reinforced areas that needed support before building out the new layout.

Master Bathroom With Soaking Tub

The new bathroom includes a full-size soaking tub with new plumbing rough-in. Walls were framed with moisture-resistant materials and insulated. The bathroom was plumbed and wired before drywall and finish work began.

What the Homeowner Said

“We were very satisfied with the work done. In fact, the design of our master bedroom and master bathroom was so excellent that we call it our five-star hotel suite. They were professional, always finished their work, and above all, we liked that they cleaned everything at the end of each workday. They stayed in contact with us throughout the entire project. We highly recommend them. It’s a pleasure working with them!”

- Ethel W., South Jersey

Services Completed in This Renovation

Bathroom Remodeling was a key component of this project. The master bathroom was built from scratch inside the new addition with a soaking tub, full plumbing rough-in, and moisture-resistant wall systems.

Basement Finishing techniques were applied to the structural work in this addition. Floor joist installation, insulation, and electrical rough-in follow the same process whether the space is below grade or at ground level.

As a full-service remodeling contractor in South Jersey, DeCicco Property Group managed every trade on this project from foundation to finish – framing, plumbing, electrical, insulation, drywall, and trim.

More Remodeling Projects

See more of our work across South Jersey. Visit our featured projects page to browse kitchen, bathroom, and whole-home renovations completed by DeCicco Property Group.